LAVGeo
Borelog · Preview · Beta
All LavGeo modules

Project

Borehole

Samples

One row per SPT sample, as on the D.O. 4 boring log. N may be a number, R, or blows/penetration such as 50/10. Leave lab columns blank where no test was done.

#From (m)To (m)USCSDescriptionSPT Nw (%)LLPIFines (%)γ (kN/m³)Delete

Log and design units

Checks

    Design units

    Consecutive samples of the same soil kind and D.O. 4 consistency band form one unit; units under 1.0 m join a neighbour. Parameters at mid-depth: N60 (energy and rod length), (N1)60 (Liao and Whitman), φ′ by Peck, Hanson and Thornburn, su = 5·N60 (Stroud). Lab values, when added in the Full version, override these.